OEM Mouth Guard Supplier Building To Your Specification

OEM is for buyers who own the specification. Send a tech pack, a 3D scan or a competitor sample and we build the tool, set the wall thickness and match the material grade. You approve a pre-production sample, then production runs 12 to 18 days. Minimum order is 100 pieces per style, and 260+ tools are already on file if the shape exists.

Specification

Built to your spec, not to ours

An OEM order starts with a measured brief: arch length in mm, wall thickness at front, mid-arch and rear, shore hardness, colour and pack. We confirm every number in writing before a tool is cut, because 0.2 mm at the occlusal surface is the difference between a 3.0 mm retail guard and a 3.5 mm shell that will not close on the molars.

Where your spec is silent, we propose a starting point from the library: 4.0 mm front and 2.5 mm rear for boxing, a 5.0 mm heat-bonded double layer for football, 2.0 mm at the front for a basketball guard that has to keep speech clear. You get the thickness report with the sample at 5 to 7 days, so the first physical guard already matches the drawing.

  • Tool cut in 12–18 days from an approved drawing
  • Wall thickness held to ±0.2 mm on every batch
  • Sampling in 5–7 days with a thickness report
Send a tech pack
Steel mouth guard tool mounted in a press for an OEM sample run
Brief checklist

What an OEM brief should cover

Four sections decide the tool, the price and the inspection sheet.

Shape and arch

Send a scan, a drawing or a sample. We measure arch length, width and palatal depth before quoting a tool.

Thickness map

Front, mid-arch and rear dimensions in mm, plus the tolerance you can accept on each point of the arch.

Material

EVA, TPE or transparent EVA, with the hardness grade and the fitting temperature written down rather than assumed.

Branding and pack

Print method, colour count, case, label and carton configuration, each one costed as a separate line on the quotation.

Consistency

Where an OEM order is won or lost

Tooling is the first gate. A machined steel tool takes 12 to 18 days and holds the arch radius to ±0.3 mm across a run, which is why 10,000 pieces from one tool stay consistent and 10,000 pieces spread across ten tools do not. We number every tool and record which one made your batch, so a later complaint can be traced to a press and a date.

The second gate is the sample. You get 1 to 3 pre-production shells in the final material, colour and print, plus a measurement sheet at three points on the arch. Once signed, that shell becomes the reference for the AQL 2.5 inspection, and any batch outside ±0.2 mm is reworked rather than shipped and argued about. That is what a signed sample is for.

  • Steel tools cut in 12–18 days, numbered and logged
  • Arch radius held to ±0.3 mm across a production run
  • AQL 2.5 inspection against the signed sample
See the inspection sheet
OEM mouth guard sample measured against a technical drawing
Documentation

Paperwork an OEM buyer can audit

An OEM buyer usually needs more than a product: a material declaration per grade, a colour recipe, a tool ownership record and a packing specification. We issue all four with the first shipment, and the same file is what a reorder is built from, which is why the fifth batch looks like the first.

We will not claim a certification the factory cannot support. The plant holds food-contact material documentation from its EVA and TPE suppliers, issues phthalate-free and REACH SVHC declarations, and can send material to a third-party lab at your cost. Market marks such as UKCA or CE stay the responsibility of your importer, and we put that in writing before the order rather than after.

  • Material declaration per grade from the supplier
  • Tool ownership record issued in your name
  • Phthalate-free and REACH SVHC declarations
  • Third-party lab testing arranged on request, at cost

Request the document set

OEM programmes

Specification work in production

Tools, thickness maps and packs built from buyer drawings rather than stock shapes.

Process

From tech pack to container

01

Tech pack review

Send drawings, scans or a sample. We return a measured spec and a tooling quote within 6 working hours.

02

Drawing approval

You approve the drawing and the thickness map, then we cut the steel tool in 12 to 18 days.

03

Pre-production sample

1 to 3 shells arrive in 5 to 7 days with a thickness and hardness report attached.

04

Pilot run

A 100 to 500 piece pilot proves the process before the bulk quantity is released to the floor.

05

Bulk and inspection

Production runs 12 to 18 days, then AQL 2.5 inspection and FOB Shenzhen or Yantian shipment.

Indicative pricing

OEM pricing at three volumes

Per piece, FOB Shenzhen, single-layer EVA shell built to your drawing with one print colour and polybag packing. Tooling quoted separately.

Pilot

from $0.68/pc

500 pcs from a new tool, one print colour, your own label and polybag packing.

  • 500 pcs
  • New tool option
  • Your label

Programme

from $0.39/pc

10,000 pcs a year on scheduled monthly releases, with a stock buffer held at the factory.

  • 10,000 pcs
  • Monthly releases
  • Stock buffer held

Send the drawing, get the tooling answer

A tech pack, a scan or a sample is enough to start. You get a tooling cost, a per-piece price and a sampling date within 6 working hours.

FAQ

OEM Mouth Guard Supplier: common questions

What do you need to quote an OEM mouth guard?
A drawing, a 3D scan or a sample, plus quantity, material and pack. If you only have a reference product, we measure it and return a specification for approval before any tool is cut.
Who owns the tool?
You do. A new steel tool is invoiced once at US$600 to US$1,800, recorded in a tool ownership document in your name, and kept in our rack. It is not used for other buyers.
Can you hold a tolerance tighter than ±0.2 mm?
On the occlusal surface we can hold ±0.15 mm from a machined tool, but it adds a finishing step and a cost. Tell us which dimension actually matters, because tightening all of them is rarely worth the price.
Do you sign an NDA before sampling?
Yes, and we can start under your NDA before you send a drawing. Tools, plates and specifications sit under your account code and are not reused for another buyer.
What is the OEM minimum order?
100 pieces per style and 50 per colourway once the tool exists. A new tool usually justifies 500 pieces or more, because the tooling cost has to be spread across the run.

Ready to cost your next mouth guard order?

Send your reference, quantity and target price. We reply with a quotation and a sampling date within 6 working hours.